$1,150,000

Construction Worker Recovers for Injuries Sustained in a Saw Blade Accident

At the time of the accident, the plaintiff, a 47 year-old union laborer, was working for Darcon Construction Inc. at a new construction site for P.S. 237, located at 36 Avenue P in Brooklyn. The plaintiff was injured while using a portable, gas-powered saw manufactured by Stihl. The saw was designed to cut masonry, concrete and metal, and was intended to be used with abrasive wheels. The saw did not come equipped with any guard on the bottom portion of the cutting wheel. Despite the manufacturer’s specific warnings attached to the saw and in the user’s manual about not using the saw to cut wood, plaintiff’s employer modified the saw by attaching a wood cutting blade and instructed him to cut wooden lagging planks used as trench support. Plaintiff was cutting the lagging when it "kicked back" and the unguarded portion of the saw struck his face. The risk of "kick back" if the saw were used to cut wood was noted by the manufacturer in their manual. Plaintiff alleged violations of N.Y. Labor Law § 241(6) against the City of New York, The New York City School Construction Authority and AMCC Corp., the general contractor. In support of his Labor Law § 241(6) claim, Plaintiff relied upon a violation of Industrial Code section 23-1.12(c). Plaintiff argued that after it was fitted with a wood cutting blade and used to cut wood, the saw became a defective wood cutting circular saw in that it lacked the proper retractable guard and base. Although Defendants claimed that the subject saw could not be fitted with a guard, and that the Industrial Code was not applicable, they did not offer any expert testimony to contradict Plaintiff’s claims. Plaintiff sustained a complex laceration to the left side of his face requiring debridement and repair. As a result of the facial laceration, plaintiff had a decreased mandibular range of motion, loss of sensitivity to the left side of his face, and possible TMJ disorder. Plaintiff also suffered from Post Traumatic Stress Disorder which prevented him from returning to work after the accident. Defendants argued that Plaintiff had made a very good recovery with very little scarring. They also claimed that Plaintiff did not have any symptoms of PTSD.

Our lawyers have recovered hundreds of millions of dollars on behalf of injured clients.

FIRST NAME
LAST NAME
EMAIL ADDRESS
PHONE NUMBER
ZIP CODE
ACCIDENT DETAILS
Enter the 4 Digit Number:
9158
No Obligation Evaluation
Construction Accident Verdicts and Settlements
  • $32,756,156
    Injured Vietnam Vet Recovers Record Verdict
  • $14,000,000
    Below the Knee Amputee Recovers Record Judgment
  • $12,000,000
    7 Year-Old Boy Recovers for Leg Injuries
  • $9,792,412
    Suit against Brain Surgeons Yields Big Verdict
  • $9,263,326
    56 Year-Old Man Recovers for Back Injuries
  • $8,000,000
    Big Recovery for Member of Rock Band
  • $6,400,000
    $6,400,000 for Union Ironworker Who Fell from Height and Injured Back
  • $6,250,000
    Construction Worker Recovers $6,250,000 in Putnam County Suit Despite 2 Million Dollar Limitation in Insurance Coverage
  • $6,000,000
    34 Year Old Man Recovers in Brooklyn Bus Collision
  • $5,500,000
    Contractor Recovers in Tractor Trailer Collision
  • $5,500,000
    Elevator Accident Leads to $5,500,000 Recovery for Injured Worker
  • $5,500,000
    Electrician Recovers for Brain Injury After Fall From Ladder
  • $5,030,572
    Laborer Recovers in Scaffold Accident
  • $4,995,000
    Laborer Injures Elbow and Ankle in Construction Accident
  • $4,000,000
    32 Year-Old Steamfitter Recovers for Accident at Work
  • $4,000,000
    16 Year-Old Recovers in Pedestrian Knockdown
  • $4,000,000
    Recover in Erbs Palsy Case
  • $4,000,000
    $4,000,000 Recovery for Non-Surgical Herniated Disc Case
  • $3,700,000
    Asbestos Worker Injured in Scaffold Collapse
  • $3,500,000
    Porter Injured in Construction Site Accident
  • $3,500,000
    Journeyman Carpenter Injured While Constructing Scaffold
  • $3,500,000
    Back and Knee Injuries Result in 3.5 Million Dollar Verdict

View All Top Verdicts and Settlements